Exam at a glance

Credential
01 general journey-level electrician
Exam approval
Washington L&I approves eligible electrician applicants before PSI scheduling
NEC and Theory
60 questions in 3 hours
Washington Codes
17 questions in 1 hour
Passing score
At least 70% on each section
NEC in posted PSI bulletin
2020. Confirm for your appointment before buying references.

Check your approval before you book

Washington Labor & Industries (L&I) reviews the qualifications for the 01 general journey-level electrician exam. The in-state application instructions list 8,000 hours of work, with at most 4,000 hours from 4,000-hour specialties, and 96 hours of Basic Classroom Instruction. Use L&I’s Verify tool to check the recorded experience and education. Ask your training director when completion and affidavit records will be submitted, especially if an employer or training program changed during your apprenticeship.

L&I’s Electrical Currents guidance describes a transition for experienced trainees and graduates of approved two-year programs that ended July 1, 2026. If L&I approved you to take the 01 exam before that date, the agency says you can retain the apprenticeship exception when reapplying. Keep the approval letter. If you worked under the transition and never received approval, ask L&I how your hours will be credited and which apprenticeship requirements apply. If you trained out of state, use the out-of-state flowchart to match your experience and education to the application route.

Resolve the NEC edition before buying a book

The PSI bulletin linked from L&I’s Electrical Examination page specifies the 2020 NEC. L&I’s laws page also describes its exam-friendly state references as valid for 2020 NEC exams, while still carrying a plan to update to 2023 in 2025 with a date to be determined. That same laws page identifies the 2023 NEC as the edition for installation rules at the time of this review and discusses the proposed December 31, 2026 transition to the 2026 NEC. Use the posted PSI bulletin as the starting point for exam study and confirm the tested edition for your appointment with L&I or PSI before purchasing or tabbing your book.

PSI permits original copyrighted references and a silent, nonprinting, nonprogrammable calculator. Its bulletin allows downloaded Washington statutes and administrative rules printed as PDFs and placed in a binder. For copyrighted references, use permanent tabs, highlighting or underlining within PSI’s rules and keep handwritten notes and removable markers out of your exam books. Keep your mistake log at home.

Train for the two scores you need

Use the Electrician columns in the bulletin’s 01-General outline. The 01 electrician has a three-hour NEC and Theory section and a one-hour Washington Codes section. The neighboring administrator and master columns include a separately timed Major Load Calculations section. Budget calculation practice inside your own NEC and Theory preparation.

The outline assigns approximately ten questions to wiring methods, seven to general trade knowledge and theory, and six each to overcurrent protection and grounding and bonding. Practice choosing between a wiring-method article, an overcurrent rule, and a grounding table before opening your book. In a theory block, write the known quantities with units, choose a formula, and check whether the result is a current, resistance, power or voltage. Treat every miss as either a navigation problem, a rule-reading problem or a calculation problem.

Build your Washington block around chapter 19.28 RCW and chapter 296-46B WAC. For example, locate the statute for a question about the legal authority to do electrical work, then locate the administrative rule for a question about the scope of a specialty. Record which reference you opened first and the section that actually answered the question. Run this block separately so you can see your readiness for each section.

Plan around the approval date and retake rules

The one-year period for electrician candidates starts on the date of the approval letter. Your first attempt in that period must include both sections. A section you pass can carry forward within that same period. Score reports from a previous period do not transfer. If you pass the NEC section and miss Washington Codes, target the rules section on your retake while there is time left on the letter.

L&I generally requires at least 14 days between attempts for candidates who have never reached the three-failure threshold. Three failures of the exam or a section within any one-year exam period trigger a 90-day wait between attempts until successful completion. When booking, put the letter date and expiration on your calendar and leave time for at least one retake if your schedule allows.

Prepare for your appointment

  • Confirm the 01 experience and education on your record or document your approved transition route.
  • Verify the exam edition for your appointment before you buy a codebook.
  • Prepare a compliant RCW/WAC binder and check your calculator and tabs.
  • Run separate timed NEC and Washington Codes blocks and score them individually.
  • Save both score reports and calendar the approval expiration.

Save this checklist in your study plan

Try a question

You score 85% on NEC and Theory and 65% on Washington Codes on your first 01 attempt. Your approval letter is still valid. What should you book after the applicable wait?

Show the answer

Retake Washington Codes within the same one-year approval period.

The 70% requirement applies to each section. L&I preserves the passing NEC and Theory score for that approval period, so use the state-law and rule references to prepare for the remaining section.

Sources